Another completed condition survey report of this Victorian building in Kings Cross. Originally a courthouse, the building has been renovated and is now a modern hostel with over 400 bed spaces across 6 storeys.
Our dedicated team carried out a survey of each room and every common space over the course of 4 days to deliver a thorough report for our client.
![Building site in London](https://www.td-re.co.uk/wp-content/uploads/2020/07/claus-grunstaudl-1_DvZyR3dRk-unsplash-480x360.jpg)
Drone Surveys
![Party Walls Explained](https://www.td-re.co.uk/wp-content/uploads/2020/07/mari-helin-ilSnKT1IMxE-unsplash-480x320.jpg)
Preventative Maintenance
![Construction in London](https://www.td-re.co.uk/wp-content/uploads/2020/07/james-sullivan-ESZRBtkQ_f8-unsplash-384x480.jpg)
Project Management
![Building site in London](https://www.td-re.co.uk/wp-content/uploads/2020/07/claus-grunstaudl-1_DvZyR3dRk-unsplash-480x360.jpg)
Drone Surveys
![Party Walls Explained](https://www.td-re.co.uk/wp-content/uploads/2020/07/mari-helin-ilSnKT1IMxE-unsplash-480x320.jpg)
Preventative Maintenance
![Construction in London](https://www.td-re.co.uk/wp-content/uploads/2020/07/james-sullivan-ESZRBtkQ_f8-unsplash-384x480.jpg)